We saved approximately $150,000 a year by cutting over 1 min/part out of production of 300,000 parts per year.
— Manufacturing Engineer in the Heavy Equipment Industry
We saved approximately $150,000 a year by cutting over 1 min/part out of production of 300,000 parts per year.
— Manufacturing Engineer in the Heavy Equipment Industry
We've had the tool in production with no problems. Our scrap rate went from approximately 400 pieces/month (due to chamfer issues) to less than one.
— Manufacturing Engineer in the Heavy Equipment Industry
We've had the tool in production with no problems. Our scrap rate went from approximately 400 pieces/month (due to chamfer issues) to less than one.
— Manufacturing Engineer in the Heavy Equipment Industry